Record sog_st_iron
IRON/IRON
Also recorded as IRON, Iron Stablecoin, Iron Finance IRON
- Lifecycle
- Collapsed
- Issuance
- Terminated
- Reference target
- US dollar
- Primary organization
- Iron FinanceNo additional recorded relationship
- Launch
- 2021-03-06
- Redemption
- Protocol Redemption
- Backing
- Hybrid or mixed
- Stabilization
- Hybrid
- Last review
- 2026-06-25
- Evidence
- 6 source records
Reviewed assessment
Identity and current state
This summary reports reviewed facts and uncertainty. It is not a rating or recommendation.Partially collateralized IRON stablecoin launched on Binance Smart Chain on March 6, 2021 and expanded through a separate Polygon deployment on May 18, 2021. The original Polygon IRON and TITAN design failed during the June 2021 bank run.
| Name | IRON |
|---|---|
| Symbol | IRON |
| Aliases | IRON, Iron Stablecoin, Iron Finance IRON |
| Asset class | Stablecoin |
| Lifecycle status | Collapsed |
| Issuance status | Terminated |
| Canonical record ID | sog_st_iron |
| Route slug | iron |
| Record confidence | High |
| Last reviewed | 2026-06-25 |
- Name
- IRON
- Symbol
- IRON
- Aliases
- IRON, Iron Stablecoin, Iron Finance IRON
- Asset class
- Stablecoin
- Lifecycle status
- Collapsed
- Issuance status
- Terminated
- Canonical record ID
sog_st_iron- Route slug
iron- Record confidence
- High
- Last reviewed
- 2026-06-25
Record coverage
| Section | Entries |
|---|---|
| Organizations | 1 |
| Sources | 6 |
| Reserve reports | 0 |
| Reserve components | 2 |
| Model-history events | 3 |
| Regulatory notes | 0 |
| Deployments | 2 |
| Issuer-control actions | 0 |
| Open questions | 3 |
| Events | 3 |
Primary display is a navigation and summary choice only. It does not replace other organizations or imply sole legal responsibility, operational control, reserve custody, or historical continuity.
- Governance
- Protocol Governed
- Primary display organization
- Iron Finance
- Primary display role
- Protocol operator
- Display selection mode
- Deterministic Policy
- Current relationships
- 0
- Ended relationships
- 1
- Unknown relationship state
- 0
- Freeze capability
- 0 recorded yes · 0 recorded no · 2 not recorded
- Blacklist capability
- 0 recorded yes · 0 recorded no · 2 not recorded
- Deployment control-event references
- 3
- Observed issuer-control events
- 0
- Relationship coverage
- 1 recorded relationship
| Organization | Organization category | Regulatory character | Jurisdiction | Role | Display priority | From | Until | Relationship status |
|---|---|---|---|---|---|---|---|---|
| Iron Finance | Protocol or software system | Protocol or decentralized system | Unknown or not publicly resolved | Protocol operator | Primary display | Not yet recorded | 2021-06-16 | Ended relationship |
Iron Finance
- Functional role
- Protocol operator
- Relationship status
- Ended relationship
- Regulatory character
- Protocol or decentralized system
- Jurisdiction
- Unknown or not publicly resolved
- From
- Not recorded
- Until
- 2021-06-16
Mechanism
How the asset works
Reference, backing, stabilization, exit, valuation, and yield remain separate facts.- Reference target
- US dollar
- Reference kind
- Fiat
- Comparison category
- US dollar
- Target value
- 1
- Reference methodology
- IRON targeted one U.S. dollar through a partially collateralized design using USDC and the TITAN share token.
- Public backing model
- Hybrid or mixed
- Canonical backing types
- Stablecoin Collateral, Crypto Collateral, Mixed
- Reserve component categories
- Stablecoin Collateral, Crypto Collateral
- Primary stabilization mechanism
- Hybrid
- Recorded model description
- Partially Collateralized Usdc Titan
- Redemption / exit model
- Protocol Redemption
- Yield / rebase profile
- No recorded change · Accrual: No recorded change
- Classification notes
- Terminal partially collateralized stablecoin collapse. Later Iron Finance activity is not treated as recovery of the original IRON.
Reserve and redemption
Reserve and redemption
Recorded components, disclosures, reports, and redemption conditions remain explicit.Reserve components
- Stablecoin collateralStablecoin Collateral
- Crypto collateralCrypto Collateral
| Disclosure status | Protocol Historical |
|---|---|
| Backing types | Stablecoin Collateral, Crypto Collateral, Mixed |
| Summary | IRON used a partially collateralized design combining USDC with algorithmically priced TITAN. During the June 2021 run, TITAN's collapse impaired the non-USDC portion of the redemption design and the peg failed. |
| As of | 2021-06-17 |
| Profile confidence | High |
- Disclosure status
- Protocol Historical
- Backing types
- Stablecoin Collateral, Crypto Collateral, Mixed
- Summary
- IRON used a partially collateralized design combining USDC with algorithmically priced TITAN. During the June 2021 run, TITAN's collapse impaired the non-USDC portion of the redemption design and the peg failed.
- As of
- 2021-06-17
- Profile confidence
- High
| Current status | Terminated |
|---|---|
| Settlement asset | Historical protocol collateral and TITAN-based redemption components |
| Eligible parties | Historical token holders interacting with residual contracts or pools, subject to chain and contract state. |
| Retail access | Failed Historical Protocol |
| Institutional access | Failed Historical Protocol |
| Minimum amount | Contract and liquidity dependent. |
| Fee | Protocol, slippage, network, and residual-liquidity costs applied. |
| Settlement time | Not reliably available after the collapse. |
| Regional limits | Chain-specific contracts and residual pools must be reviewed separately. Later Iron Finance products do not prove recovery of the original IRON stablecoin. |
- Current status
- Terminated
- Settlement asset
- Historical protocol collateral and TITAN-based redemption components
- Eligible parties
- Historical token holders interacting with residual contracts or pools, subject to chain and contract state.
- Retail access
- Failed Historical Protocol
- Institutional access
- Failed Historical Protocol
- Minimum amount
- Contract and liquidity dependent.
- Fee
- Protocol, slippage, network, and residual-liquidity costs applied.
- Settlement time
- Not reliably available after the collapse.
- Regional limits
- Chain-specific contracts and residual pools must be reviewed separately. Later Iron Finance products do not prove recovery of the original IRON stablecoin.
| Date | Publisher | Type | Assets covered | Record confidence |
|---|---|---|---|---|
| No reserve reports have been added yet. | ||||
No reserve reports have been added yet.
Deployments and legal context
Deployments and legal context
Network state, contract identity, legal notices, and value states remain separate.| Network | Network record state | Standard | Public deployment category | Canonical deployment type | Operational state | Recorded status | Change or proposal state | Canonicality | Canonicality record state | Verification state | Contract identity state | Contract or identifier | Freeze | Blacklist | Control events | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BNB Smart Chain | Specific network recorded | Not yet recorded | Historical or legacy deployment | Historical Original Issuance | Unknown or unresolved | Failed or Inactive | No separate change state recorded | Legacy deployment | Canonicality recorded | Source-linked record; identifier not recorded | Identifier not recorded | Identifier not recorded | Not yet recorded | Not yet recorded | 1 | Original IRON protocol deployment launched on 2021-03-06 using BUSD, USDT, and the STEEL share token. Exact contract identity, first mint, and final BSC lifecycle remain unresolved. |
| Polygon | Specific network recorded | Not yet recorded | Historical or legacy deployment | Historical Canonical Issuance | Collapsed or failed | Collapsed | No separate change state recorded | Legacy deployment | Canonicality recorded | Identifier recorded; verification not recorded | Identifier recorded | 0xD86b5923F3AD7b585eD81B448170ae026c65ae9a | Not yet recorded | Not yet recorded | 2 | Separate Polygon IRON deployment launched on 2021-05-18 using USDC and TITAN. This deployment became the principal June 2021 bank-run and collapse case. |
| Date | Title | Authority / publisher | Type | Summary |
|---|---|---|---|---|
| No regulatory notes have been added yet. | ||||
No regulatory notes have been added yet.
Evidence
Evidence
Publisher, provenance, supported claims, archive state, reliability, and publication date remain separate.| Source | Publisher | Source category | Provenance | Primary or secondary | Supported claims | Archive | Reliability |
|---|---|---|---|---|---|---|---|
| Iron Finance post-mortem — 17 June 2021 Published 2021-06-17 | Iron Finance | Official statement or announcement Canonical: Official Statement | Subject-controlled source | Primary source | Collapse Postmortem, Mechanism Failure, Event Date | Archive index or wildcard | High |
| Runs on Algorithmic Stablecoins: Evidence from Iron, Titan, and Steel Published 2022-06-02 | Board of Governors of the Federal Reserve System | Research or security report Canonical: Research Report | Independent third-party source | Secondary source | Mechanism and Run Analysis, Collateral Model, Depeg Event | Archive index or wildcard | High |
| IRON token contract on Polygon Published Not yet recorded | PolygonScan | On-chain record or explorer Canonical: Onchain Contract | Technical primary source | Primary source | Contract Identity, Polygon Deployment | No archive recorded | High |
| IRON: The first partial-collateralized stablecoin on Binance Smart Chain Published 2021-03-04 | Iron Finance | Official statement or announcement Canonical: Official Blog | Subject-controlled source | Primary source | Launch Date, Bsc Launch, Minting, Redemption, Liquidity Rollout, Original Bsc Public Launch | Archive index or wildcard | High |
| Iron Finance Expansion to Polygon Published 2021-05-16 | Iron Finance | Official statement or announcement Canonical: Official Blog | Subject-controlled source | Primary source | Polygon Launch Date, Separate Deployment, Usdc Titan Collateral, Bsc Predecessor, Polygon Network Launch and Separate Token Set | Archive index or wildcard | High |
| IRON Stablecoin Launch — 25 August 2021 Published 2021-08-24 | Iron Finance | Official statement or announcement Canonical: Official Blog | Subject-controlled source | Primary source | V2 Launch, Redesigned Collateral Model, Post Collapse Successor Boundary, Post Collapse Redesigned V2 Launch | Archive index or wildcard | High |
Known unknowns
Known unknowns and coverage
Missing or disputed facts remain visible instead of being converted into certainty.| Topic | What remains unclear | Value state | Priority | Last checked |
|---|---|---|---|---|
| Bnb Contract First Mint and Final Lifecycle | The original BSC public launch is fixed to 2021-03-06, but the complete BSC contract identity, exact first mint, supply history, and final deployment lifecycle are not normalized. | Unknown after review | Medium | 2026-06-25 |
| Residual Contract and Liquidity State | Residual balances, pools, redemption functions, and later reuse of Iron Finance contracts were not exhaustively reviewed. | Unknown after review | Medium | 2026-06-14 |
| V1 V2 Token and Liability Continuity | Iron Finance launched a redesigned IRON v2 in August 2021 after stating that the stablecoin would be rebuilt from scratch. Token-contract continuity, holder migration, liability continuity, and the final v2 lifecycle are not normalized. | Unknown after review | High | 2026-06-25 |
Bnb Contract First Mint and Final Lifecycle
The original BSC public launch is fixed to 2021-03-06, but the complete BSC contract identity, exact first mint, supply history, and final deployment lifecycle are not normalized.
- Value state
- Unknown after review
- Priority
- Medium
- Last checked
- 2026-06-25
Residual Contract and Liquidity State
Residual balances, pools, redemption functions, and later reuse of Iron Finance contracts were not exhaustively reviewed.
- Value state
- Unknown after review
- Priority
- Medium
- Last checked
- 2026-06-14
V1 V2 Token and Liability Continuity
Iron Finance launched a redesigned IRON v2 in August 2021 after stating that the stablecoin would be rebuilt from scratch. Token-contract continuity, holder migration, liability continuity, and the final v2 lifecycle are not normalized.
- Value state
- Unknown after review
- Priority
- High
- Last checked
- 2026-06-25
Lifecycle
History
Current classification remains separate from dated changes and incidents.Model and lifecycle changes
| Date | Event | Category | Subtype | Status effect | Recovery |
|---|---|---|---|---|---|
| 2021-03-06 | Iron Finance launches the original IRON protocol on BSC | Launch and introduction | Launch | Remained active | Not applicable |
| 2021-05-18 | Iron Finance launches a separate IRON deployment on Polygon | Launch and introduction | Launch | Remained active | Not applicable |
| 2021-06-16 | IRON V1 collapses during a bank run and TITAN price failure | Depeg and peg stress | Depeg | Collapsed or failed | Collapsed |
Related records and corrections
Corrections and further reading
Open connected records, methodology, machine-readable data, or report a correction.- All stablecoinsCompare this record with the rest of the archive.
- Iron FinanceUnknown or not publicly resolved
- Event registry3 connected events recorded.
- MethodologyRead classification, evidence, and value-state rules.
- CorrectionsReport a source, relationship, or record problem.
- Data manifestInspect the machine-readable public layer.