Stablecoin dossierReturn to register

Record sog_st_iron

IRONIRON

Also recorded as IRON, Iron Stablecoin, Iron Finance IRON

Lifecycle
Collapsed
Issuance
Terminated
Reference target
US dollar
Primary organization
Iron FinanceNo additional recorded relationship
Launch
2021-03-06
Redemption
Protocol Redemption
Backing
Hybrid or mixed
Stabilization
Hybrid
Last review
2026-06-25
Evidence
6 source records

Reviewed assessment

Identity and current state

This summary reports reviewed facts and uncertainty. It is not a rating or recommendation.

Partially collateralized IRON stablecoin launched on Binance Smart Chain on March 6, 2021 and expanded through a separate Polygon deployment on May 18, 2021. The original Polygon IRON and TITAN design failed during the June 2021 bank run.

NameIRON
SymbolIRON
AliasesIRON, Iron Stablecoin, Iron Finance IRON
Asset classStablecoin
Lifecycle statusCollapsed
Issuance statusTerminated
Canonical record IDsog_st_iron
Route slugiron
Record confidenceHigh
Last reviewed2026-06-25
Name
IRON
Symbol
IRON
Aliases
IRON, Iron Stablecoin, Iron Finance IRON
Asset class
Stablecoin
Lifecycle status
Collapsed
Issuance status
Terminated
Canonical record ID
sog_st_iron
Route slug
iron
Record confidence
High
Last reviewed
2026-06-25
Record coverage
SectionEntries
Organizations1
Sources6
Reserve reports0
Reserve components2
Model-history events3
Regulatory notes0
Deployments2
Issuer-control actions0
Open questions3
Events3
Organizations and control

Primary display is a navigation and summary choice only. It does not replace other organizations or imply sole legal responsibility, operational control, reserve custody, or historical continuity.

Governance
Protocol Governed
Primary display organization
Iron Finance
Primary display role
Protocol operator
Display selection mode
Deterministic Policy
Current relationships
0
Ended relationships
1
Unknown relationship state
0
Freeze capability
0 recorded yes · 0 recorded no · 2 not recorded
Blacklist capability
0 recorded yes · 0 recorded no · 2 not recorded
Deployment control-event references
3
Observed issuer-control events
0
Relationship coverage
1 recorded relationship
All current, ended, and unknown-state organization relationships
OrganizationOrganization categoryRegulatory characterJurisdictionRoleDisplay priorityFromUntilRelationship status
Iron FinanceProtocol or software systemProtocol or decentralized systemUnknown or not publicly resolvedProtocol operatorPrimary displayNot yet recorded2021-06-16Ended relationship
Protocol or software system

Iron Finance

Primary display
Functional role
Protocol operator
Relationship status
Ended relationship
Regulatory character
Protocol or decentralized system
Jurisdiction
Unknown or not publicly resolved
From
Not recorded
Until
2021-06-16

Mechanism

How the asset works

Reference, backing, stabilization, exit, valuation, and yield remain separate facts.
Reference target
US dollar
Reference kind
Fiat
Comparison category
US dollar
Target value
1
Reference methodology
IRON targeted one U.S. dollar through a partially collateralized design using USDC and the TITAN share token.
Public backing model
Hybrid or mixed
Canonical backing types
Stablecoin Collateral, Crypto Collateral, Mixed
Reserve component categories
Stablecoin Collateral, Crypto Collateral
Primary stabilization mechanism
Hybrid
Recorded model description
Partially Collateralized Usdc Titan
Redemption / exit model
Protocol Redemption
Valuation source
IRON redemption design, collateral state, and market price during the June 2021 run
Yield / rebase profile
No recorded change · Accrual: No recorded change
Classification notes
Terminal partially collateralized stablecoin collapse. Later Iron Finance activity is not treated as recovery of the original IRON.

Reserve and redemption

Reserve and redemption

Recorded components, disclosures, reports, and redemption conditions remain explicit.

Reserve components

  • Stablecoin collateralStablecoin Collateral
  • Crypto collateralCrypto Collateral
Reserve profile
Disclosure statusProtocol Historical
Backing typesStablecoin Collateral, Crypto Collateral, Mixed
SummaryIRON used a partially collateralized design combining USDC with algorithmically priced TITAN. During the June 2021 run, TITAN's collapse impaired the non-USDC portion of the redemption design and the peg failed.
As of2021-06-17
Profile confidenceHigh
Disclosure status
Protocol Historical
Backing types
Stablecoin Collateral, Crypto Collateral, Mixed
Summary
IRON used a partially collateralized design combining USDC with algorithmically priced TITAN. During the June 2021 run, TITAN's collapse impaired the non-USDC portion of the redemption design and the peg failed.
As of
2021-06-17
Profile confidence
High
Redemption profile
Current statusTerminated
Settlement assetHistorical protocol collateral and TITAN-based redemption components
Eligible partiesHistorical token holders interacting with residual contracts or pools, subject to chain and contract state.
Retail accessFailed Historical Protocol
Institutional accessFailed Historical Protocol
Minimum amountContract and liquidity dependent.
FeeProtocol, slippage, network, and residual-liquidity costs applied.
Settlement timeNot reliably available after the collapse.
Regional limitsChain-specific contracts and residual pools must be reviewed separately. Later Iron Finance products do not prove recovery of the original IRON stablecoin.
Current status
Terminated
Settlement asset
Historical protocol collateral and TITAN-based redemption components
Eligible parties
Historical token holders interacting with residual contracts or pools, subject to chain and contract state.
Retail access
Failed Historical Protocol
Institutional access
Failed Historical Protocol
Minimum amount
Contract and liquidity dependent.
Fee
Protocol, slippage, network, and residual-liquidity costs applied.
Settlement time
Not reliably available after the collapse.
Regional limits
Chain-specific contracts and residual pools must be reviewed separately. Later Iron Finance products do not prove recovery of the original IRON stablecoin.
Reserve and attestation history
DatePublisherTypeAssets coveredRecord confidence
No reserve reports have been added yet.

No reserve reports have been added yet.

Evidence

Evidence

Publisher, provenance, supported claims, archive state, reliability, and publication date remain separate.
6 source identities · 6 evidence relations
SourcePublisherSource categoryProvenancePrimary or secondarySupported claimsArchiveReliability
Iron Finance post-mortem — 17 June 2021
Published 2021-06-17
Iron FinanceOfficial statement or announcement
Canonical: Official Statement
Subject-controlled sourcePrimary sourceCollapse Postmortem, Mechanism Failure, Event DateArchive index or wildcardHigh
Runs on Algorithmic Stablecoins: Evidence from Iron, Titan, and Steel
Published 2022-06-02
Board of Governors of the Federal Reserve SystemResearch or security report
Canonical: Research Report
Independent third-party sourceSecondary sourceMechanism and Run Analysis, Collateral Model, Depeg EventArchive index or wildcardHigh
IRON token contract on Polygon
Published Not yet recorded
PolygonScanOn-chain record or explorer
Canonical: Onchain Contract
Technical primary sourcePrimary sourceContract Identity, Polygon DeploymentNo archive recordedHigh
IRON: The first partial-collateralized stablecoin on Binance Smart Chain
Published 2021-03-04
Iron FinanceOfficial statement or announcement
Canonical: Official Blog
Subject-controlled sourcePrimary sourceLaunch Date, Bsc Launch, Minting, Redemption, Liquidity Rollout, Original Bsc Public LaunchArchive index or wildcardHigh
Iron Finance Expansion to Polygon
Published 2021-05-16
Iron FinanceOfficial statement or announcement
Canonical: Official Blog
Subject-controlled sourcePrimary sourcePolygon Launch Date, Separate Deployment, Usdc Titan Collateral, Bsc Predecessor, Polygon Network Launch and Separate Token SetArchive index or wildcardHigh
IRON Stablecoin Launch — 25 August 2021
Published 2021-08-24
Iron FinanceOfficial statement or announcement
Canonical: Official Blog
Subject-controlled sourcePrimary sourceV2 Launch, Redesigned Collateral Model, Post Collapse Successor Boundary, Post Collapse Redesigned V2 LaunchArchive index or wildcardHigh

Known unknowns

Known unknowns and coverage

Missing or disputed facts remain visible instead of being converted into certainty.
Open questions
TopicWhat remains unclearValue statePriorityLast checked
Bnb Contract First Mint and Final LifecycleThe original BSC public launch is fixed to 2021-03-06, but the complete BSC contract identity, exact first mint, supply history, and final deployment lifecycle are not normalized.Unknown after reviewMedium2026-06-25
Residual Contract and Liquidity StateResidual balances, pools, redemption functions, and later reuse of Iron Finance contracts were not exhaustively reviewed.Unknown after reviewMedium2026-06-14
V1 V2 Token and Liability ContinuityIron Finance launched a redesigned IRON v2 in August 2021 after stating that the stablecoin would be rebuilt from scratch. Token-contract continuity, holder migration, liability continuity, and the final v2 lifecycle are not normalized.Unknown after reviewHigh2026-06-25

Bnb Contract First Mint and Final Lifecycle

The original BSC public launch is fixed to 2021-03-06, but the complete BSC contract identity, exact first mint, supply history, and final deployment lifecycle are not normalized.

Value state
Unknown after review
Priority
Medium
Last checked
2026-06-25

Residual Contract and Liquidity State

Residual balances, pools, redemption functions, and later reuse of Iron Finance contracts were not exhaustively reviewed.

Value state
Unknown after review
Priority
Medium
Last checked
2026-06-14

V1 V2 Token and Liability Continuity

Iron Finance launched a redesigned IRON v2 in August 2021 after stating that the stablecoin would be rebuilt from scratch. Token-contract continuity, holder migration, liability continuity, and the final v2 lifecycle are not normalized.

Value state
Unknown after review
Priority
High
Last checked
2026-06-25

Lifecycle

History

Current classification remains separate from dated changes and incidents.

Model and lifecycle changes

  1. Iron Finance launches the original IRON protocol on BSCLaunch
  2. Iron Finance launches a separate IRON deployment on PolygonOther
  3. IRON V1 collapses during a bank run and TITAN price failureDepeg
Event timeline
DateEventCategorySubtypeStatus effectRecovery
2021-03-06Iron Finance launches the original IRON protocol on BSCLaunch and introductionLaunchRemained activeNot applicable
2021-05-18Iron Finance launches a separate IRON deployment on PolygonLaunch and introductionLaunchRemained activeNot applicable
2021-06-16IRON V1 collapses during a bank run and TITAN price failureDepeg and peg stressDepegCollapsed or failedCollapsed

Related records and corrections

Corrections and further reading

Open connected records, methodology, machine-readable data, or report a correction.